Final assembly. I threw in the towel early December and towed it in. Engine is mounted and partially connected, what's left is:
- finish connecting engine
- port cleaning and install intake manifold
- reinstall cooling system
- reinstall Fluidampr
- replace fuel filter
- replace tie rods
- measure and order proper hardware for spindle to toe arm (I've ordered 3 different lengths that people have told me to order that don't fit)
- replace front left brake caliper and install all calipers
- bleed brakes
- fill and flush coolant
- flush engine oil
- reinsert gear selector shaft (if anyone knows how please hmu because my mechanic doesn't know how yet lmao)
- flush transmission oil
- install panzer plate
There's also various things that need to be torqued or properly adjusted (spindles are loose, axles are loose, and the rear end links need to be installed). And I asked him to raise the car to an inch over stock.
After I get it back I'll just have to get the bumper on, sort out some fog light headaches, and I'll be good to go. I misplaced my throttle pipe so I just ordered some ARM replacement charge pipes.